Hours in - 9:40a.m. - 5p.m. (7hrs 20mins total)
Job - Maker
9:40a.m.
After an incident where someone dropped the spinner, I started today by touching up the paint on the spinner.
Collecting the spray paint colour in a bottle before using a fine brush to touch up places.
I also used a gold paint pen to touch up the gold colour of the pegs.
Once finished touching up, I moved onto helping paint the runs on the lattice inside black, and the tops of the runs gold as directed by one of the designers.
Once these were done I then moved onto painting the inner parts of the laser cut out pieces with black paint, as when primed some white had dripped down in places, as well as gold, and to give a more professional and neat finish these needed to be painted black, this process took a long time, and a lot of members on the team ended up joining me with this after a while.
Once done we waited for them to dry for a little while, before we moved onto attaching the lattices, to the bases using a nail gun.
3p.m
We started to take apart the set that we had put up as a test and started to get things together ready to pack into the van.
3:30p.m.
We started to pack the van, being careful not to damage anything, this took a little bit of time and a lot of careful lifting, we were able to get everything into the van with careful stacking.
Once the van was packed up we then tidied up our work area and made sure that everything necessary for the installation was noted down and accounted for, the afternoon was very hectic however everyone worked together well and we were able to get things done without any issue.